How to develop a maintenance plan for marine:
1. The daily and monthly maintenance plans for ships shall be formulated by the responsible persons of the two departments based on the actual situation of the ship, and shall be uniformly organized, implemented and inspected by the Maritime Department.
2. The annual maintenance of ships shall be coordinated and arranged by each branch bureau. The planned maintenance items shall be compiled by the ship based on its technical condition, reviewed by the Maritime Department, and reported to the ship management department of the branch bureau at least one month in advance. After approval, the Maritime Department shall organize and implement them.
3. The suspension maintenance work is mainly carried out by crew members, and relevant departments should actively prepare accessories, tools, and other equipment to create conditions for crew members to self repair or expand self repair; However, if there are significant maintenance projects or machining requirements that this ship is unable to achieve, they can be resolved with the consent of the ship management department of the branch bureau and by contacting relevant manufacturers; After the suspension of maintenance is completed, the ship management department of the branch bureau or the commissioned ship management personnel of the maritime department shall organize the acceptance inspection.
4. The daily maintenance and repair work plan for ships should be included in the management and assessment of the policies and objectives of each unit, and should be based on the approved daily maintenance and repair plan for ships,
Timely maintenance and ship inspection. If changes are necessary, they should be approved by the relevant department and the repair plan should be adjusted in a timely manner.
5. Ship maintenance work should implement the “four confirmations”
I.Determine personnel: assign tasks to personnel according to the equipment and parts of the ship;
II. Determine the time: Each part and equipment of the ship should have a maintenance cycle determined, and regular maintenance should be carried out;
III.Determine the project: Within each cycle, specific maintenance and repair projects should be developed;
IV.Determine quality: Inspect and accept according to the maintenance quality requirements of each part and equipment.
6. When carrying out maintenance work on ships, relevant ledgers, logs, and records of ship maintenance, replacement, measurement, etc. should be kept properly.